Proposed data center on Post Road (Paradise)

Proposed / approved · Oppidan (reported); applicant Post Road Capital Real Estate Fund, LP · Las Vegas

An approved, single-story data center project. It appears in the directory only and is never shown on property pages.

Facility details

Operator
Oppidan (reported); applicant Post Road Capital Real Estate Fund, LP
Status
Proposed / approved as of March 4, 2025
Clark County Planning Commission approved WS-25-0066 on March 4, 2025. Construction start not confirmed.
Location
4460 W Post Rd area: north and south sides of Post Road, 700 feet east of Cameron Street, Paradise, Las Vegas
Location basis
Approximate: interpolated street address
Clark County address locator, interpolated street address 4460 W Post Rd (score 80)
Map point
36.07546, -115.20276 · Open in OpenStreetMap
On property pages
No. Its status (proposed / approved) is listed in the directory only; its location is approximate (interpolated street address).
Last verified
October 16, 2026

Published figures

  • Clark County record WS-25-0066: "DESIGN REVIEW for a proposed warehouse (data center) with accessory offices on a 9.54 acre portion of 12.3 acres". Source: Clark County (Legistar public records API)
  • News coverage reports a five-megawatt, 61.6 thousand square foot single-story building at 4460 W. Post Road. Source: NVBEX

Status history

  • March 4, 2025: Proposed / approved. Clark County Planning Commission approved WS-25-0066 on March 4, 2025. Construction start not confirmed.

Sources

  1. Clark County WS-25-0066: design review for a proposed warehouse (data center) (applicant Post Road Capital Real Estate Fund, LP)Clark County (Legistar public records API) · Government record · checked October 16, 2026Approved by the Clark County Planning Commission on 2025-03-04; 9.54-acre portion of 12.3 acres; north and south sides of Post Road (alignment), 700 feet east of Cameron Street, Paradise.
  2. Clark County Planning Commission Approves Five-Megawatt Data Center (NVBEX, March 10, 2025)NVBEX · News report · checked October 16, 2026Identifies the project as Oppidan's, at 4460 W. Post Road; five megawatts; 61.6 KSF single-story building; construction must commence within two years.